9 Elements of a Kick-Off Meeting for a Custom eLearning Project

9 Elements of a Kick-Off Meeting for a Custom eLearning Project By Leigh Anne Lankford

It’s easy to treat a kick-off meeting as a formality. A quick introduction. A high-level timeline. Maybe a few questions at the end. But this meeting is where the tone of the entire project gets set. It’s where expectations are clarified, assumptions are surfaced, and alignment either happens, or doesn’t.

And if it doesn’t happen here, it tends to show up later as rework, delays, or stakeholder frustration. A strong kick-off meeting doesn’t need to be complicated. But it does need to be intentional.

Here are the elements that make the difference.

1. Clear Project Objectives (Beyond “We Need Training”)

Start with the business need. What’s driving this project? What’s not working today? What needs to change? 

This is where you move beyond:

  • “We need a course on X”

And into:

  • “We need people to do X differently so that Y improves”

For example, reducing errors, improving customer experience, or increasing speed to proficiency. Without this clarity, design decisions become subjective. With it, the team has a shared lens for making choices throughout the project.

2. Definition of Success

Once the objective is clear, the next question is: how will you know if it worked?

This can include:

  • Observable behavior changes
  • Business metrics (when available)
  • Assessment or completion expectations
  • Stakeholder satisfaction

It doesn’t need to be overly complex. But it does need to be discussed. Otherwise, teams often default to measuring what’s easy instead of what actually matters.

3. Roles and Responsibilities

This is one of the most underestimated parts of a kick-off meeting. Who owns what?

Specifically:

  • Who is responsible for instructional design decisions
  • Who provides content or SME input
  • Who reviews deliverables
  • Who consolidates feedback
  • Who has final approval

Without clarity here, projects slow down quickly, especially when multiple stakeholders are involved and everyone assumes someone else is making the call.

4. Scope and Boundaries

What exactly are you building? This is where you align on:

  • Number of modules or courses
  • Level of interactivity
  • Media elements (video, animation, or scenarios)
  • Deliverables (storyboards, prototypes, final courses)

It’s also helpful to talk about what’s not included. Scope doesn’t need to feel restrictive, but it should feel understood. When it isn’t, scope creep becomes inevitable.

5. Content Sources and SME Involvement

Where is the content coming from? This is often where timelines are won or lost.

Clarify:

  • Existing materials that can be used
  • Gaps that require SME input
  • Who the SMEs are
  • How and when they’ll be involved

Also discuss expectations around:

  • Availability
  • Review timelines
  • Level of detail needed

When SME involvement is loosely defined, delays tend to follow.

6. Timeline and Milestones

A final deadline is helpful but it’s not enough. Break the project into phases:

Then align on:

  • What happens in each phase
  • When stakeholders are expected to engage
  • What could impact timing

This creates a shared understanding of how the work will move forward, not just when it needs to be finished.

7. Review and Feedback Process

This is where many projects run into friction. Without a defined process, feedback can become:

  • Delayed
  • Conflicting
  • Difficult to act on

Set expectations early:

  • Who is involved in each review
  • How feedback will be consolidated
  • What “approval” means at each stage
  • What is “locked” and can’t be changed at each stage 
  • Expected turnaround times

A simple structure here can save a significant amount of time later.

Streamline your SME Review process

free pdf

8. Tools, Technology, and Access

What tools will the team be using and does everyone have access? This might include:

Also confirm:

  • File sharing methods
  • Version control expectations
  • Access to systems or content
  • Access to source files 

These details can feel small, but they often create avoidable delays if not addressed upfront.

9. Communication and Working Style

Finally, how will the team stay aligned as the project moves forward? Set expectations for:

  • Regular check-ins or status updates
  • Preferred communication channels
  • Escalation paths if something feels off-track

This is also a good time to align on responsiveness and availability. A little clarity here goes a long way in preventing confusion and keeping momentum.

Final Thought

A kick-off meeting doesn’t need to be long or overly detailed. But it does need to be thoughtful. When teams take the time to align upfront:

  • Decisions are easier to make
  • Feedback is more focused
  • Timelines are more realistic
  • And the overall experience is smoother for everyone involved

When that alignment is missing, even strong teams can struggle. Because most project challenges aren’t about capability, they’re about clarity. And the kick-off meeting is where that clarity begins.

Ready to Work with Us?

Does your L&D team have more projects than people?

Many organizations in this position turn to custom eLearning development to scale training without overloading internal teams. If you’re exploring options or comparing eLearning development companies, you should learn more about how organizations design and scale these solutions. 

TrainingPros is a learning and development company that connects organizations with experienced instructional designers, eLearning developers, and performance consultants. We’ve been named a Top 20 Staffing Company by Training Industry and a Champion of Learning by the Association for Talent Development (ATD), recognition that reflects our commitment to delivering high-quality, tailored learning solutions.

If your learning initiatives require additional support, whether for a single project or a large-scale rollout, our relationship managers can help you find the right expertise quickly and confidently.

When you have more projects than people™, let TrainingPros find the right consultant to start your project with confidence.

Working Successfully with Contract L&D Professionals

free pdf

Frequently Asked Questions About
eLearning Project Kick-Off Meetings:

What is a kick-off meeting in an eLearning project?


A kick-off meeting is the first formal meeting where the project team aligns on goals, scope, timelines, roles, and expectations before design and development begin.

Typically, this includes the project sponsor, instructional designers, eLearning developers, SMEs, and any stakeholders responsible for feedback or approval.

Most kick-off meetings range from 60 to 90 minutes, depending on the size and complexity of the project.

Alignment. Especially around objectives, scope, and decision-making. When those are clear, the rest of the project tends to move more smoothly.

Yes. While it won’t eliminate all challenges, a well-run kick-off meeting reduces the likelihood of delays, miscommunication, and rework by setting clear expectations from the start.

Picture of Leighanne Lankford

Leighanne Lankford

With more than 30 years of experience in Learning and Development, I bring a wealth of expertise to every project. My career has spanned roles from instructional designer to learning leader, equipping me with a deep understanding of the industry. Holding an MS in Human Resource Development, I’ve been recognized with multiple industry awards for my contributions as a practitioner. Under my leadership, my company has won dozens of L&D industry awards, reflecting our commitment to excellence. Since 2007, I’ve been passionate about connecting consultants with impactful projects at TrainingPros, ensuring both clients and consultants thrive. Connect with me to explore insights that elevate your L&D strategies.
TrainingPros Blog Rings Logo Icon | When You Have More Projects Than People...

You Might Also Like